likebooster↗

Think outside the box.

Menu
Let’s talk
← All insights

Practical guide

What to Include in a Custom-Sewing Tech Pack Before Asking for a Quote

Before requesting a custom-sewing quote, prepare a clear garment description, annotated drawings, material requirements, a measurement plan, quantities and the details that still need development. Add references and an approval process so the producer can distinguish fixed decisions from open questions. You can begin with an incomplete pack, provided the unknowns are visible.

A useful tech pack connects the idea to decisions someone can estimate and eventually produce. For an initial enquiry, it should explain the intended result well enough to identify missing work. Production release needs a more settled version, with the relevant specifications and approvals recorded.

Give the garment an identity and a purpose

Start with a cover sheet containing the project name, garment code, version, date and responsible contact. Describe who will wear the garment, where it will be used and what matters most about its fit and construction.

“Team hoodie for indoor work and commuting” provides a different starting point from “lightweight promotional top for a summer event.” Neither description specifies a fabric, but both give context for discussing one.

At LikeBooster, custom sewing is arranged through a Ukrainian sewing factory. The item, materials, sizing, branding and order details are discussed for each project. That service description does not establish the origin of every material, a particular certification or a fixed manufacturing specification.

Show the construction from more than one view

Include front and back drawings, plus detail views for features that would otherwise be unclear. Label pockets, closures, cuffs, hems, panels and any other construction decisions relevant to your design. Simple, clearly annotated drawings are more useful than a polished image that hides the details.

Use reference photographs to explain a specific feature. State exactly what you want to borrow: the pocket shape, the overall proportions or the look of the neckline. Mark anything in the photograph that should not be copied. Ensure you have the necessary rights to supplied artwork and designs.

Where construction is undecided, write a question. For example: “Please propose a suitable cuff construction for this use” is a development request. It should not be mistaken for an approved instruction. Ask the producer which drawing details are necessary for the next stage.

Build a materials and trims list

A bill of materials is a structured list of what goes into the item. For an enquiry, record what is known and identify what needs sourcing or advice.

ComponentSpecification or referenceStatus / question
Main fabricComposition, construction, weight and colour if knownConfirmed reference or sourcing request
Secondary fabricIntended use, such as lining or contrast panelConfirm required performance and compatibility
Rib or bindingLocation, appearance and relevant dimensionsProducer input needed where unspecified
Closures and trimsType, position, colour and referenceAvailability and alternatives to discuss
LabelsArtwork, content, placement and dimensionsContent and requirements to review
PackagingRequested presentation and unit groupingConfirm scope and quantities

A named colour in a presentation is not a complete material approval. Supply the reference you use and ask how physical colour selection will be agreed. If you send a fabric sample, label it and explain whether it is mandatory or only illustrates the desired feel.

Avoid marking a material “approved” because it appeared in another product. Availability and suitability need checking for the new garment. Any requested substitution should be documented and reviewed before it becomes part of the final specification.

Define measurements so another person can repeat them

A size label by itself does not describe fit. Include a measurement sheet for the garment, with units, measurement points and diagrams showing where each measurement begins and ends.

For an early quote, identify the proposed base size and the required size range. If you have an approved pattern, measurement chart or reference garment, state what it represents and make it available through the agreed process. If you need pattern development or size grading, list that work explicitly rather than assuming it is included.

Use a measurement record like this:

Measurement pointHow it is measuredBase-size targetAllowed variation
\[Named point\]\[Diagram reference and method\]\[Value and units\]\[To agree\]

The allowed variation, or tolerance, needs agreement for each relevant measurement and the production process. Do not copy a blanket tolerance from an unrelated garment. State whether the targets describe the garment before or after any agreed washing or finishing step.

Keep body-size guidance separate from finished garment specifications. Ask who is responsible for preparing and checking the full size chart, grading and fit. Those responsibilities affect the work required before production can be released.

Specify branding as part of the garment

Attach the artwork files and record their versions. For each position, give the intended dimensions, placement reference and colour requirements. If the decoration method remains open, say so and request a suitability review.

A logo on a mockup does not settle how it will be reproduced. The selected material, construction and available decoration area need to be reviewed together. LikeBooster’s embroidery and printing page explains the information needed to begin that discussion without assuming a particular print technology.

Identify who may approve artwork changes. A producer may flag detail that needs adjustment, but a revised logo or changed wording should have an identifiable approval before it is used.

Separate the quote request from the approval plan

Include quantities by garment and colour, plus the size breakdown if known. If the breakdown is provisional, label it and ask what information is needed to firm up the estimate. Record the delivery destination and required arrival date as planning inputs, not as a confirmed production promise.

Ask the estimate to identify its assumptions and the work included. Useful questions cover material sourcing, pattern development, grading, sampling, decoration preparation, packaging and delivery. Clarify what would trigger a revised estimate, such as a material substitution or a construction change.

Then agree the review stages. Depending on the project, these may involve drawings, material references, fit samples or a decorated sample. Do not assume that every sample type is included or available. Record the cost, purpose and decision owner for each stage that is agreed.

Keep an approval record people can use

Use one place to track open issues and revisions. Each entry should describe the issue, who must answer it and which version changes when it is resolved.

A practical release record includes:

  • The current garment specification and artwork versions.
  • The approved material and colour references.
  • The agreed measurements, size range and tolerances.
  • The quantities and breakdown by variant.
  • The approved sample or other agreed reference, where applicable.
  • The remaining exceptions, if any, and their written resolution.
  • The person authorised to approve production and the date of approval.

If a sample is reviewed, describe the outcome precisely. “Fit approved; sleeve artwork still open” keeps the remaining decision visible. Avoid a general “looks good” that could be read as approving every aspect of the order.

Send what you know and mark what you need help with

Before sending the pack, check that the drawings, measurement sheet, materials list and quantity summary describe the same garment version. Remove obsolete attachments or label them as superseded. A short cover note can list the unresolved questions in priority order.

You do not need to invent technical answers to make the enquiry look complete. LikeBooster’s project brief guide encourages bringing existing references and making constraints visible. A clear initial pack helps identify the next decisions; the final production specification follows the agreed development and approval work.